
Greenfields
The Challenge
Early-stage development of greenfield assets requires high-impact decisions with minimal data. Teams must plan well locations, spacing, timing, and injection strategies long before a complete understanding of the reservoir is available. The challenge is finding a way to evaluate these scenarios quickly and confidently without overcommitting resources or time.
The Problem
Conventional simulation workflows are too slow and data-hungry for greenfield planning. When subsurface data is sparse, full-scale simulation becomes impractical for evaluating multiple development paths. This forces teams to rely on oversimplified models or delay key decisions, increasing risk and limiting the ability to capture early value.
The Solution
Aqueon enables rapid greenfield development planning by using Proxy Modeling to simulate a wide range of scenarios from a single full simulation. These physics-informed models retain accuracy even with limited data and can forecast performance across different development strategies. By accelerating scenario testing and maintaining physical integrity, Aqueon helps operators reduce uncertainty, improve asset valuation, and move forward with greater confidence.
Learn More
Link to Case Studies, etc